High-density hashing, built properly. Hash and Convertible configurations for sites outside BC Hydro service territory or with off-grid / behind-the-meter power (see Edge Power & Link). Convertible builds carry the headroom to switch to AI later.

Who this is for
These builds are only for sites outside BC Hydro service territory, or sites with off-grid or behind-the-meter power such as on-site generation. We do not build hashing loads for BC Hydro-connected sites.
Where it fits
- Edge Can 20 and Edge Can 40 containers, and Edge Build.
- Power, cooling and noise are designed for continuous high-density load.
- Built to the Canadian Electrical Code; shipped units are field-evaluated to CSA SPE-1000 by an accredited inspection body before delivery.
Convertible headroom
A Convertible build is sized with extra power and cooling capacity and standard rack space, so the same unit can be refitted for AI or compute later without replacing the shell, power or cooling.
How it works
- 1 · Assess. Site, power, network and data review, with a written readiness report. About the assessment
- 2 · Build. Design, build, electrical, networking and commissioning.
- 3 · Manage. Remote 24/7 monitoring, updates and AI tuning, alongside your IT team. About Edge Watch monitoring
Add-on options
Every Edge system can be extended. Add-ons are quoted with your system after the assessment.
Off-grid power & backup
Solar, battery storage and gas or diesel generators with automatic transfer, sized to your load.
Starlink & failover internet
Satellite internet as the main line or as automatic backup to fibre, cable or cellular.
Point-to-point wireless links
Extend one network across a large property to shops, outbuildings, gates and cabins.
Heat recovery
Duct waste heat into an adjacent shop, office or greenhouse in the cold months.
Edge Watch 24/7 monitoring
Power, cooling, security and uplink watched around the clock, with tiered response.
Clean-agent fire suppression
Smoke and heat detection with an optional clean-agent system that protects the equipment.
How buying works
- 1 · Two-minute start. Take the Edge Readiness Quiz or book a discovery call.
- 2 · Assessment. We review your site, power, network and data, then send a written readiness report.
- 3 · Proposal. A clear scope, schedule and price for your system and any add-ons. Monthly options available.
- 4 · Build & commissioning. Installed to code under permit, tested and documented.
- 5 · Handover & monitoring. You own the hardware and get full admin access; Edge Watch keeps an eye on it 24/7.
Frequently asked questions
Can you build this for a BC Hydro-connected site?
No. These configurations are only for sites outside BC Hydro service territory or with off-grid / behind-the-meter power.
Can it switch to AI later?
Yes, if it is built as Convertible. The headroom is designed in from the start.
Where do you work?
Builds: Canada (pilot program). Assessment and management: worldwide.
Can a hashing site run off-grid?
Yes. Edge Power & Link covers solar, battery and generator power for sites outside utility service.
How long does a build take?
It depends on the size and the site. The assessment ends with a written schedule. Rack and room builds are usually the quickest; containers need shop time, testing and delivery.
Can you work with our existing IT team or provider?
Yes. Pfitztech designs, builds and monitors the infrastructure and works alongside your IT team or provider. You keep full admin access.
Are monthly payment options available?
Yes. Monthly options combine hardware and management in one payment. Founding pilot pricing on request.
Enquire about a hashing or convertible build
Tell us about your site and what you want the system to do. Brandon replies personally. Founding pilot pricing on request.
By submitting you agree to our privacy policy.